Post occupancy evaluation of certified Passivhaus homes in the UK

…internal temperature Source of heating Additional measurement data: External temperature Solar radiation The PHPP sheet for each dwelling Occupancy levels Electricity bills Author: Passivhaus Trust Publication date: July 2017 DOWNLOAD…

Categories
Presentation Video

Homes that are low energy and perform as designed

…Tyrrell, Director, T2 Architects Download presentation 12:25 Residential building performance evaluation (BPE) Brogan Watkins, Sustainability Consultant, Hoare Lea Download presentation 12:40 Post Occupancy Evaluation (POE) findings from Chobham Manor Mark Dowson,…

Categories
Guidance

Building Performance Evaluation Guide

This guidance is aimed at housing clients, and anyone interested in Building Performance Evaluation (BPE) who wants to evaluate and improve the performance of homes. Its purpose is to provide…

Categories
Video

GHA Bitesize Webinar Series – People and their data – Ethics and engagement of building performance evaluation

Content available for Good Homes Alliance members only. If you are already a GHA member, please Log In or Sign Up for an account. Check our Member Directory to see…

Categories
Guidance

RIBA Sustainable Outcomes Guide

…explains each sustainable outcome and their key metrics, and provides design principles to achieve the outcome and describes approaches that can be used to verify performance using post occupancy evaluation

Categories
Tool

Social Value Toolkit for Architecture

…demonstrate value quantitatively and this toolkit provides a post occupancy evaluation survey and methodology for reporting social value as a financial return on investment. The Social Value Toolkit was developed…

Categories
Case Study

Knights Park

…(CHP) and HIU No thermal bridging at building junctions 500mm insulation in the roofs 300mm insulation in walls Post-occupancy evaluation is planned for 2022/23, two years after completion. This is…

Categories
Case Study

Marleigh Active Homes

…handover October 2021 Key facts/highlights Net zero operational carbon 5 prototype homes are being monitored in detail with 18 months of post-occupancy evaluation (POE) carried out by PTE and the…

Categories
Case Study

Seaward Way

…least the substructure, frame and upper floor, post-construction. Where available for other building components, this will be also be incorporated into the post-construction embodied carbon assessment. Materials and construction Porotherm…

Categories
Case Study

Virido

…to completion, including a 1 year post occupancy study with BPE that demonstrated no performance gap. Key information Client: Hill Developer: Hill Architects: Pollard Thomas Edwards Location: Cambridge Engineers/consultants: AECOM…